Filatex India Ltd.
NVEW's third ASRS build for Filatex's Bharuch facility, currently on site — the relationship goes back to 2017.
NVEW
Every stacker-crane ASRS structure NVEW has erected on record — the client, the site, the crew size, and photos from the floor where we're allowed to take them. This covers ASRS work specifically; racking, mezzanine and other project categories will be added here as we go.
THE RECORD
Listed newest first. Tap any photo to view it larger. A handful of sites don't allow cameras — we've noted those rather than leave them off the list.
NVEW's third ASRS build for Filatex's Bharuch facility, currently on site — the relationship goes back to 2017.
Currently underway at Fiat India's Pune plant — another restricted-access automotive site.
A second ASRS system for Mahindra, following the 2022 Igatpuri installation — this one built around an active vehicle assembly line.
High-bay ASRS storage for a large recycling and materials-recovery facility in Nasik — one of the bigger crews we've fielded.
ASRS erection for Indorama's Nagpur facility — the crew ran night shifts to keep the structure on schedule.
A second ASRS project for Maruti Suzuki, this time at their Gurugaon facility.
A pharmaceutical-grade ASRS structure for Zydus's Ahmedabad plant.
NVEW's first ASRS build for Mahindra — indoor racking integrated alongside existing production and conveyor equipment at Igatpuri.
A large-scale ASRS system for Welspun's flooring manufacturing and distribution facility in Hyderabad.
A second ASRS installation for Filatex's Bharuch facility, four years after the first.
Precision ASRS erection for a machine-tool manufacturer's Pune facility — a smaller footprint, same structural discipline.
ASRS storage for Unichem's pharmaceutical manufacturing facility in Goa.
High-bay ASRS racking for Piaggio's two- and three-wheeler manufacturing plant in Baramati.
ASRS structure erected for a chemical manufacturing facility in Bharuch's industrial belt.
ASRS work inside Maruti Suzuki's Manesar plant — NVEW's first project with the automaker.
NVEW's first ASRS project for Filatex — the start of a relationship that's continued across three builds since.
One of NVEW's largest ASRS builds by crew size — structural erection for a newsprint and paper manufacturing facility.
NVEW's earliest ASRS project on record — a 280-strong erection crew inside an Indian Army ordnance depot, where site photography isn't permitted.
Tell us the site, the scale, and the timeline — we'll tell you what it takes to get it erected and commissioned.
Start a Conversation